Hi All,
We are running the HyperScale 1.5 Reference Architecture with RHEL on top of HP Apollo 4200 Gen9 servers. Now we planning to upgrade the OS to 7.9 through CV FR upgrade.
I have few quries and would like to hear from people who did the upgrade already.
- As per CV, the upgrade takes around 60-90 min. What would be expected duration per node in real world.
- Is there any firmware pre-request required for this upgrade?
- Does anyone reverted the change successfully ? If yes, how long it takes per node
- Do we have any check point to validate the upgradation once completed for first node? instaed waiting till 6th Node upgrade.
Thanks in Advance
Mani