Hello,
our SLA status is at only 60% after upgrading to 11.40. back in January. That means that about 40% says “missed” and when I check the SLA report it says “no finished job within SLA period” for about 500 clients.
After checking them, I can say that there were indeed jobs running in the past few days for those clients (including full backups). The majority of those clients don’t have a file-system backup configured but SQL, EDB or VM backup.

Does anybody know where this issue may come from?
Thanks in advance

