This is probably a really basic question but I just need validation that this is working the way I suspect it is.
I have some huge Exchange mailboxes, some of them containing over 3 million messages. I also set limits on how long my mailbox archive jobs can run so they are not active during the day and adding load onto our Exchange system.
My question is, if a mailbox archive job is stopped before finishing does the next job treat the messages that were done as completed? For example, a mailbox has 100,000 items in it and the archive Monday night completes 50,000 of them before being stopped. Does the next job try to archive all 100,000 messages again or just the 50,000 that were not finished?