If not using Plans then I try use the time as an ordering list.
So it would look like this:
17:00 - VM backup
18:00 - DB Backup
I have multiple schedules on 2 customers, so this makes it easier to track. When I disable a schedule, I prefix it with ZZZ so that it moves to the bottom of the list.
I do the same with disabled Storage Policies and Clients and Subclients.