My goal is to set up my DB server in CV so that it can be backed up my SQL DB server twice a day on two different tapes from my tape library. Therefore, I intend to use 14 tapes in a week based on my condition.
But the library tape is selecting randomly and not in accordance with the policy, despite my best efforts to schedule it.
I have made scratch group for every day in CV and assigned it to the specific tape thought media in library tab as well as I have given the date path in schedule policy but still my condition is not achievable
Is there a way that we could resolve this situation?
.