I’m trying to see if a particular schedule (ToTape) ran on schedule.
When I looked at the job summary (storage policy > ToTape > right click > view jobs), I don’t see a job ran on Sept 2 1am. The 2 jobs listed here are the ones I triggered manualy.

But when I generate a “Backup Job Summary Report” for that policy, it looks like it ran.

We are running commcel version 11.32.63.
Did the job actually run? Is there any other ways on how I can verify it?