Hello Guys,
In my CommVault setup, I have selected scheduled monthly first full backup job in auxiliary copy as shown in below screen snap, but its still selecting additional backup which triggered manually from HANA command line.
![](https://uploads-eu-west-1.insided.com/commvault-eu/attachment/27b082aa-b1a7-4981-beeb-d64ae36dab49.png)
![](https://uploads-eu-west-1.insided.com/commvault-eu/attachment/16955c49-ccd6-420e-b3bd-75c6224d727c.png)
Similarly, if the command line triggers the add on job, it did not considered as first full of that month and picked up another scheduled job for auxiliary.
![](https://uploads-eu-west-1.insided.com/commvault-eu/attachment/c7f40cda-278c-434c-b41e-652991139c8d.png)
is any specific setting I have to consider which will not select the command line backup jobs triggered from HANA command line, this is happening specific to HANA DB backup.