Skip to main content

Hi all,

Commvault Pruning runs at very random times, and I can’t have eyes on the SIDBPrune.log 24/7 to catch it.

Is there any way to schedule the Pruning operation for a certain day/time?

 

-JJunkala

Configure Data Pruning blackout window on MediaAgents with time ranges at which you don’t want to run pruning.

 

https://documentation.commvault.com/11.22/expert/6611_blackout_window.html


Reply