Please advise, how to move backup data from LTO-7 media (tape library LTO-7) to LTO-9 (tape library LTO-9).
The tape library is connected to Hyperscale environment.
We have four storage policies and all the policies are configured aux. copies.
Thanks in advance.
Best answer by Mike Z-man
Hello AnandK,
You can always leverage Aux Copy to do this. This will entail setting up a new Policy Copy for the LTO9 Tape Library. If using Command Center that would be a new Backup Destination for the Plan.
IF Both the LTO7 and LTO9 are configured for the same MediaAgents then you can leverage Tape to Tape Copy.
****** This is a Direct Copy so LTO9 tape will be the same content as LTO7
You can always leverage Aux Copy to do this. This will entail setting up a new Policy Copy for the LTO9 Tape Library. If using Command Center that would be a new Backup Destination for the Plan.
IF Both the LTO7 and LTO9 are configured for the same MediaAgents then you can leverage Tape to Tape Copy.
****** This is a Direct Copy so LTO9 tape will be the same content as LTO7