lets say there are 1000 jobs needs to move on tape, i want to take the secondary copy of jobs on date wise it should not pic random jobs for aux copy.
any how i can set a limit Auxiliary copy jobs, once fist 5 jobs get copied then only next copy job should start. Using stand alone tape library
Page 1 / 1
Here you go:
https://documentation.commvault.com/commvault/v11/article?p=11506.htm
You can change the Priority of what the Aux Copy selects.
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.