Hi guys,
We are implementing an Air Gapped DR site, so the DR site only receives an offline copy from the main one through aux copies.
For aux copies, we only disabled their schedule from the “System Created Autocopy Schedule” and created a new specific schedule which start the aux copies to the DR site after the blackout window.
Since the DR MAs and Library are only accessible during the Air Gap window, I was wondering if rescheduling the remaining system created jobs (DDB Backup, DDB Verification, DDB Space Reclamation, Data Aging) to the Air Gap period doesn’t cause any issue when running at the same time with the Aux Copies (Our Aux Copies use Deduplication).
I know that, when running the DDB Backup jobs, this may cause issues with Aux Copies as of the screenshot below :
https://documentation.commvault.com/11.24/expert/12504_deduplication_database_backup.html
So my question is, is it possible to launch all the previously listed system jobs at the same time with Aux Copies without any issue, or, is there any precedence between all of them ? Like, the DDB backup has to be started after Aux Copies ?
Thanks in advance :)